3 MW HPC subsea data center in Port of Hanstholm
The Port of Hanstholm is strategically located in the North West of Jutland, directly facing the North Sea.
Subsea Cloud Partners will deploy two immersive cooled pods into the harbour basin, directly connected to the wind power produced by the 3 turbines on the harbour (3 X 3.45 MW).
This region serves as a hub for research and development as well as the demonstration of cutting-edge energy systems. Widely recognized for its role in Østerild as a testing ground for both onshore and offshore wind turbines, it consistently drives innovation and technological advancement.
In a collaborative effort, the local authorities and the Port of Hanstholm are working together to progress further by constructing new facilities dedicated to emerging energy technologies, including the establishment of the largest test and demonstration site for wave energy.
Project information
Location:
Secure harbour bassin
in Port of Hanstholm
Number of pods:
2 units (2 x est. 1.5 MW)*
Timeline:
First operation Q1 2025
Power:
Direct BtM connection
to 3 X 3.45 MW wind turbines,
no grid loss
PUE 0.88
Configuration
16 racks (768U)
Passive liquid immersion
Power load capacity: 0.2-4.0 MW
Rack density: 250 kW
Temperature min-max (liquid): 0degC - 67degC
Operations and maintenance
Full power and fibre redundancy (ring net)
Scheduled maintenance every 5 years (max. 12 hours) or or upon request from operator
Pod lifetime 20+ years
All-risk insurance incldued
* (Alt. 1 X 1.5 MW + 2 X 1 MW)
Exampled of CPU / GPU configurations (per pod)
Pod Configuration | Capacity | Data sheets |
---|---|---|
CPU-based | 768 x Dual AMD EPYC™ 9004 Processors | https://go.hypertec.com/hubfs/Datasheets/TRIDENT/TRIDENT%20iC615DR-G6_Datasheet_web_en_06-2023.pdf?hsCtaTracking=24a38212-cce3-49e4-bda8-bc9f51412108%7C85bea917-ce7f-48e5-b944-bc0367983ad6 |
GPU-based | 128 X NVIDIA DGX B200 (SuperPod) | https://resources.nvidia.com/en-us-dgx-systems/dgx-b200-datasheet |