3 MW HPC subsea data center in Port of Esbjerg
The Port of Esbjerg is strategically located in the North East of Jutland, directly facing the North Sea.
Subsea Cloud Partners will deploy two immersive cooled pods into the harbor basin, with option to expand up to 37.5 MW. The data center will be powered by nearby offshore wind and solar panels on the harbor.
Data center is expected to reach a Net PUE of 0.88, due to its ability to recycle heat back into power.
Esbjerg is a hub for the North Sea offshore wind build-out and host a large expertise for offshore and subsea technologies. Esbjerg is also a hub for some of the global subsea fiber connections.
Project information
Location:
Secure harbour bassin
in Port of Hanstholm
Number of pods:
2 units (2 x est. 1.5 MW)*
Timeline:
First operation Q1 2025
Power:
Direct BtM connection
to 3 X 3.45 MW wind turbines,
no grid loss
PUE 0.88
Configuration
16 racks (768U)
Passive liquid immersion
Power load capacity: 0.2-4.0 MW
Rack density: 250 kW
Temperature min-max (liquid): 0degC - 67degC
Operations and maintenance
Full power and fibre redundancy (ring net)
Scheduled maintenance every 5 years (max. 12 hours) or or upon request from operator
Pod lifetime 20+ years
All-risk insurance incldued
* (Alt. 1 X 1.5 MW + 2 X 1 MW)
Exampled of CPU / GPU configurations (per pod)
Pod Configuration | Capacity | Data sheets |
---|---|---|
CPU-based | 768 x Dual AMD EPYC™ 9004 Processors | https://go.hypertec.com/hubfs/Datasheets/TRIDENT/TRIDENT%20iC615DR-G6_Datasheet_web_en_06-2023.pdf?hsCtaTracking=24a38212-cce3-49e4-bda8-bc9f51412108%7C85bea917-ce7f-48e5-b944-bc0367983ad6 |
GPU-based | 128 X NVIDIA DGX B200 (SuperPod) | https://resources.nvidia.com/en-us-dgx-systems/dgx-b200-datasheet |