3 MW HPC subsea data center in Port of Esbjerg

image.png

The Port of Esbjerg is strategically located in the North East of Jutland, directly facing the North Sea.

Subsea Cloud Partners will deploy two immersive cooled pods into the harbor basin, with option to expand up to 37.5 MW. The data center will be powered by nearby offshore wind and solar panels on the harbor.

Data center is expected to reach a Net PUE of 0.88, due to its ability to recycle heat back into power.

Esbjerg is a hub for the North Sea offshore wind build-out and host a large expertise for offshore and subsea technologies. Esbjerg is also a hub for some of the global subsea fiber connections.​

Do you want to know more about the project?

Thanks for submitting!

Project information
pod transperant_edited.png

Location:
Secure harbour bassin
in Port of Hanstholm

Number of pods:
2 units (2 x est. 1.5 MW)*

Timeline:

First operation Q1 2025

Power:
Direct BtM connection
to 3 X 3.45 MW wind turbines,
no grid loss

PUE 0.88

Configuration

16 racks (768U)

Passive liquid immersion

Power load capacity: 0.2-4.0 MW

Rack density: 250 kW

Temperature min-max (liquid): 0degC  - 67degC

Operations and maintenance

Full power and fibre redundancy (ring net)

Scheduled maintenance every 5 years (max. 12 hours) or or upon request from operator

Pod lifetime 20+ years

All-risk insurance incldued

* (Alt. 1 X 1.5 MW + 2 X 1 MW)