BUILDING SUBSEA HPC DATA CENTERS

50% REDUCED ENERGY / CO2

FOR THE MOST SUSTAINABLE DATA CENTER IN THE WORLD

Subsea Cloud Partners leverages Subsea Cloud technology to develop, operate and power
immersive cooled HPC AI data centres on the seabed in the North Sea and Baltic Sea Region

Leveraging the natural cooling of the sea and large-scale offshore renewable energy

Ocean

Learn more about our 3 MW
in Port of Hanstholm

Learn more about our 3 MW
in Port of Esbjerg

image.png

OUR MISSION

ENERGY WILL BE THE LIMIT FOR AI, NOT TECHNOLOGY

In 2026, Europe will use 150 TWh on data centers
(+50% since 2022), with a world demand passing 1.000 TWh equilivant to the electricty consumption of Japan.

We deploy the most energy efficient HPC data centers in the world for a sustainable and global AI journey

OUR TECHNOLOGY

DELIVERS WORLDS ONLY TRUE NEGATIVE PUE (PUE 0.88) AND WUE DATA CENTER FOR A SUSTAINABLE AI BUILD-OUT.


Based on 40 years of frontier innovation in the offshore oil and gas industry, each pod is roughly the size of a 20-foot container and by using the natural cooling of the sea with immersive cooling, the unmatched rack power density allows a single pod can hold the capacity of a NVIDIA Super Pod each and less than 0,88 PUE.

  • Minimum -40% power cost compared to traditional data centres. PUE of 0.88

  • Immersive cooling capacity, enabling twice the CPU rack density (e.g. 1.536 X AMD EPYC 9000 series in a pod)

  • 30% Increase in hardware lifespan

  • All-risk insurance, Tier III SLA

image.png
pod transperant_edited.png
image.png
image.png
EU DATA CENTRES COST 9-14 MILLION EURO / MW CAPEX
- AND COSTLY TO OPERATE

OUR OFFERING

We provide turn key data center offerings for hyperscalers and capacity build-out partnerships for existing data center owners and operators as POWER&DC-as-a-Service.

image.png

OUR PROJECT

​​​We have set an ambitious goal to build the world largest AI infrastructure across the North Sea; the North Sea Super AI Cluser, reaching across several countries as compute nodes.​​​

​​
3 MW BUILD-OUT UNDERWAY TOWARD 3 GW TARGET

To prepare North Sea authorities for large scale offshore build-out, we are currently developing a 3 MW project at a harbour location on the Danish west coast. To be deployed in 2025.

Picture2.png
North Sea Super AI Cluster.png
Windmill

EU TARGET 11.7% ENERGY CONSUMPTION REDUCTION TOWARD 2030

 - and is introducing requirements for KPI reporting to implement PUE targets.

At the same time European data center power consumption  is expected to grow 8% (CAGR)

A STEP CHANGE IN TECHNOLOGY IS NEEDED

image_edited.jpg

OUR FOOTPRINT

IS TO DEVELOP AND BUILD TWO SUPER AI CLUSTERS ACROSS THE NORTH SEA AND BALTIC SEA

We work with the worlds largest hyperscalers to to deliver more than 3 GW of sustainable AI compute capacity to more than 500 million European users.

For an incomparable "Silicing Valley" opportunity for Europe.

MEMBERS OF
Energy Cluster Denmark.png
danish_data_center_industry_logo_edited.
SUPPORTED BY
image.png
image.png
image.png
image.png

Get in Touch

Subsea Cloud Partners

Lergravsvej 59A

2300 Copenhagen S

Follow us on LinkedIn

  • LinkedIn

Thanks for submitting!

bottom of page